Construction planned around operations,
built by HOUSE ON
For co-living and goshiwon, completion is only the beginning. From permit review to room layout, trades and completion, we build with opening day in mind.
Planning a build?
Are these your concerns?
Buildings with many small rooms involve dense trade work and strict regulations. HOUSE ON resolves the sticking points before work begins.
-
Will this building even get a permit as a goshiwon or co-living?
We review permits before you signEnter an address and we check the building register, zoning and fire-safety conditions to assess feasibility in advance.
-
My estimate has so many "lump sum" items that I can't tell what's included.
We break down items and quantities by tradeFrom demolition to furniture, estimates are split by trade so you can compare and adjust.
-
What if the rooms don't fill after construction?
We design rooms that get filledDaylight, noise, bathroom location, storage — we lay out rooms where residents stay longer.
Building expertise,
plus an operator's standards.
HOUSE ON is a construction company that builds only co-living and goshiwon. Knowing one building type deeply is what makes the biggest difference.
- 01
Permit review
before contractUsing our own property check system, we verify public records, zoning and fire-safety conditions before discussing construction.
- 02
Room layouts designed
around operationsWe don't just add rooms. We set a room count and circulation that balance rent and vacancy.
- 03
Transparent estimates
itemized by tradeDemolition, plumbing, fire safety, electrical, carpentry, furniture — every trade lists its items and quantities.
- 04
Photo records
before it's coveredWork hidden after finishing — piping, insulation, waterproofing — is photographed and sent to you each time a stage is completed.
Before you sign the contract,
review the building first.
Enter an address in the HOUSE ON property check and it automatically queries public records, then rates goshiwon (multi-unit living facility) permit feasibility on a 4-level scale. Add lease terms and you also get a simple financial analysis.
- Automatic public-record lookupBuilding register · Zoning · Road access
- 4-level rating with reasonsSuitable · Needs review · Unsuitable
- Financial analysisMonthly revenue · Net profit · Break-even occupancy
- Consult straight from resultsThe address you checked carries into your consultation
From building review
to after completion, one company.
When design, construction and permits are handled separately, responsibility is split too. HOUSE ON takes responsibility from start to finish through a single point of contact.
Site & building review
We first check use, number of floors and fire-safety conditions to see if the building can work as a goshiwon or co-living.
Room layout & design
Room count, bathrooms and shared spaces are planned around operations.
Itemized estimates
Items and quantities are broken down by trade and adjusted to your budget.
Permit handling
We take care of change of use, fire-safety compliance and electrical upgrade procedures in order.
Construction & site management
We manage schedule and quality and send you progress photos.
Furniture & appliances
Wardrobes, desks, beds, refrigerators and air conditioners installed in every room.
Smart systems
Digital door locks, CCTV and the equipment needed for unstaffed operation are installed together.
Completion & defect repair
Handover follows final cleaning and inspection, and we take responsibility for defects from report to repair.
From a worn-out corridor
to a space you want to stay in.
Drag the handle left and right to compare. This is HOUSE ON's remodeling direction for turning an aging goshiwon into premium co-living.
BEFOREAFTER
Aging goshiwon corridor remodel · Walls, lighting, flooring and doors replacedStaged image illustrating our construction direction.





Photos are staged images showing HOUSE ON's finishing standards. Actual project photos from our sites are shown during consultation.

No trade left out,
all in one go.
Buildings with many small rooms have dense trade work. We go through the full list of trades a goshiwon or co-living needs with you from the start.

See it
without being there.
We send photo reports each time a stage is completed. Piping, insulation, waterproofing and fire-safety systems hidden behind finishes are photographed before they're covered, so you can check them later too.

Rather than squeezing in one more room,
rooms people stay in.
Daylight, noise, bathroom location, storage. How many more months a resident stays is decided on the drawings. Together we set the balance of room count and rent, shared-space circulation, and a finish grade that fits your budget.
From consultation to completion,
six steps.
You receive a schedule by trade before signing. At every stage change, we tell you what's finished and what remains.
- Consultation
After a property check (Korean) by address, we hear your budget and timeline.
- Site assessment
We check the building's condition and permit conditions on site.
- Design & estimate
We provide a room layout plan and an itemized estimate by trade.
- Contract & permits
We finalize the schedule and start the permit process.
- Construction
We report progress with photos at every stage.
- Completion & handover
Handover follows inspection, cleaning and furniture setup, and we take responsibility for defects.
Frequently asked questions
How much does construction cost?
It varies widely with floor area, building condition, room count and finish grade. After a site assessment we provide an itemized estimate by trade and adjust trades and finishes to your budget.
How long does construction take?
It depends on scale and permit status. We provide a schedule by trade before signing and let you know right away if it changes.
Can you remodel a goshiwon that is currently operating?
Yes. We work floor by floor or section by section and look at ways to shorten the vacancy period with you.
I haven't chosen a building yet.
Start with a free property check (Korean) using a candidate building's address. Bring the results when you request a consultation and we'll pick up from there.
What happens if the permit isn't granted?
Before signing, we confirm feasibility through public records and a site assessment. We don't recommend construction for buildings that don't meet the conditions.
How are defects handled after completion?
HOUSE ON takes responsibility from defect report to repair. With our stage-by-stage photo records, causes can be identified quickly.
A building address is all
you need to get started.
Leave your details and a construction manager will call you directly.