Construction planned around operations,
built by HOUSE ON

For co-living and goshiwon, completion is only the beginning. From permit review to room layout, trades and completion, we build with opening day in mind.

01 PERMITPermit pre-review
02 DESIGNOperations-based room layout
03 ESTIMATETransparent itemized estimates
04 RECORDPhoto records at every stage

Planning a build?
Are these your concerns?

Buildings with many small rooms involve dense trade work and strict regulations. HOUSE ON resolves the sticking points before work begins.

  • Will this building even get a permit as a goshiwon or co-living?

    We review permits before you signEnter an address and we check the building register, zoning and fire-safety conditions to assess feasibility in advance.

  • My estimate has so many "lump sum" items that I can't tell what's included.

    We break down items and quantities by tradeFrom demolition to furniture, estimates are split by trade so you can compare and adjust.

  • What if the rooms don't fill after construction?

    We design rooms that get filledDaylight, noise, bathroom location, storage — we lay out rooms where residents stay longer.

Building expertise,
plus an operator's standards.

HOUSE ON is a construction company that builds only co-living and goshiwon. Knowing one building type deeply is what makes the biggest difference.

  • 01

    Permit review
    before contract

    Using our own property check system, we verify public records, zoning and fire-safety conditions before discussing construction.

  • 02

    Room layouts designed
    around operations

    We don't just add rooms. We set a room count and circulation that balance rent and vacancy.

  • 03

    Transparent estimates
    itemized by trade

    Demolition, plumbing, fire safety, electrical, carpentry, furniture — every trade lists its items and quantities.

  • 04

    Photo records
    before it's covered

    Work hidden after finishing — piping, insulation, waterproofing — is photographed and sent to you each time a stage is completed.

GENERALHOUSE ON
Room divisionDivided however is easiest to build.Divided around rooms that get filled.
EstimateMany "lump sum" items.Items and quantities broken down by trade.
PermitsLeft to the owner.We handle change of use, fire safety and electrical upgrades with you.
During worksYou have to visit the site to know.Photo reports at every stage.
After completionDone at completion.We take responsibility for defect reports and repairs.

Before you sign the contract,
review the building first.

Enter an address in the HOUSE ON property check and it automatically queries public records, then rates goshiwon (multi-unit living facility) permit feasibility on a 4-level scale. Add lease terms and you also get a simple financial analysis.

  • Automatic public-record lookupBuilding register · Zoning · Road access
  • 4-level rating with reasonsSuitable · Needs review · Unsuitable
  • Financial analysisMonthly revenue · Net profit · Break-even occupancy
  • Consult straight from resultsThe address you checked carries into your consultation
Check a property (Korean) This is a preliminary review and does not guarantee final permit approval.

From building review
to after completion, one company.

When design, construction and permits are handled separately, responsibility is split too. HOUSE ON takes responsibility from start to finish through a single point of contact.

  • Site & building review

    We first check use, number of floors and fire-safety conditions to see if the building can work as a goshiwon or co-living.

  • Room layout & design

    Room count, bathrooms and shared spaces are planned around operations.

  • Itemized estimates

    Items and quantities are broken down by trade and adjusted to your budget.

  • Permit handling

    We take care of change of use, fire-safety compliance and electrical upgrade procedures in order.

  • Construction & site management

    We manage schedule and quality and send you progress photos.

  • Furniture & appliances

    Wardrobes, desks, beds, refrigerators and air conditioners installed in every room.

  • Smart systems

    Digital door locks, CCTV and the equipment needed for unstaffed operation are installed together.

  • Completion & defect repair

    Handover follows final cleaning and inspection, and we take responsibility for defects from report to repair.

From a worn-out corridor
to a space you want to stay in.

Drag the handle left and right to compare. This is HOUSE ON's remodeling direction for turning an aging goshiwon into premium co-living.

Before remodeling: a narrow goshiwon corridor with peeling wallpaper and old fluorescent lights After remodeling: a corridor with ivory walls, oak doors and warm indirect lighting BEFOREAFTER

Aging goshiwon corridor remodel · Walls, lighting, flooring and doors replacedStaged image illustrating our construction direction.

Single room with a built-in oak wardrobe, desk and indirect lighting
PRIVATE ROOMSingle room with built-in storage and indirect lighting
Private bathroom with ivory tiles and bronze fixtures
BATHROOMPrivate bathroom · Large-format tile finish
Corridor lined with oak doors and digital door locks
CORRIDORDigital door locks · Linear lighting
Shared kitchen with oak cabinets and a round table
LOUNGEShared kitchen and lounge
Co-living building with an ivory facade lit up at night
EXTERIORExterior · Facade renovation

Photos are staged images showing HOUSE ON's finishing standards. Actual project photos from our sites are shown during consultation.

Site with light-gauge steel walls and sprinkler piping under construction

No trade left out,
all in one go.

Buildings with many small rooms have dense trade work. We go through the full list of trades a goshiwon or co-living needs with you from the start.

DemolitionPlumbing & pipingHeatingFire safetyElectricalWindows & doorsLight-gauge wallsCarpentryFire doorsSoundproofing & insulationTilingBathroomsWallpaper & paintFlooringFurnitureAppliancesSecurity & telecomSignageFinal cleaning
Photographing sprinklers and insulation with a phone before the ceiling is closed

See it
without being there.

We send photo reports each time a stage is completed. Piping, insulation, waterproofing and fire-safety systems hidden behind finishes are photographed before they're covered, so you can check them later too.

Reviewing a floor plan of small rooms with finish material samples

Rather than squeezing in one more room,
rooms people stay in.

Daylight, noise, bathroom location, storage. How many more months a resident stays is decided on the drawings. Together we set the balance of room count and rent, shared-space circulation, and a finish grade that fits your budget.

From consultation to completion,
six steps.

You receive a schedule by trade before signing. At every stage change, we tell you what's finished and what remains.

  1. Consultation

    After a property check (Korean) by address, we hear your budget and timeline.

  2. Site assessment

    We check the building's condition and permit conditions on site.

  3. Design & estimate

    We provide a room layout plan and an itemized estimate by trade.

  4. Contract & permits

    We finalize the schedule and start the permit process.

  5. Construction

    We report progress with photos at every stage.

  6. Completion & handover

    Handover follows inspection, cleaning and furniture setup, and we take responsibility for defects.

Frequently asked questions

How much does construction cost?

It varies widely with floor area, building condition, room count and finish grade. After a site assessment we provide an itemized estimate by trade and adjust trades and finishes to your budget.

How long does construction take?

It depends on scale and permit status. We provide a schedule by trade before signing and let you know right away if it changes.

Can you remodel a goshiwon that is currently operating?

Yes. We work floor by floor or section by section and look at ways to shorten the vacancy period with you.

I haven't chosen a building yet.

Start with a free property check (Korean) using a candidate building's address. Bring the results when you request a consultation and we'll pick up from there.

What happens if the permit isn't granted?

Before signing, we confirm feasibility through public records and a site assessment. We don't recommend construction for buildings that don't meet the conditions.

How are defects handled after completion?

HOUSE ON takes responsibility from defect report to repair. With our stage-by-stage photo records, causes can be identified quickly.

A building address is all
you need to get started.

Leave your details and a construction manager will call you directly.

Consultation stepsPhone consultation → Site assessment → Design & estimate

Permit check (Korean)Consultation